As Cadeler’s wind installation vessel, Wind Mover, carries out installation for the Baltic Power offshore wind farm, HARCO’s equipment and operators are on board to support the operation.

The setup features a complete Dynamic Traverse System engineered for large-scale installation projects, providing accurate control and stabilisation of suspended loads across all lifting operations. Operated by HARCO’s specialised personnel, it ensures safe and efficient project execution.

A project-specific setup – delivered as a complete solution

The systems rented by Cadeler for the project are assembled from well-proven modules, making it possible to tailor the equipment to the specific operation and project requirements while relying on tested and familiar technology.

The scope includes a fully integrated system solution covering equipment, mobilisation, operational execution, on-site maintenance, and demobilisation. Operation and servicing are performed by HARCO personnel trained and certified in the maintenance of HARCO equipment, ensuring a high level of technical integrity and operational reliability. And a dedicated tool and spare parts container is included to support uninterrupted offshore operations.

Overall, the setup ensures extreme precision and controlled lifting throughout the installation, supporting efficient operations from start to finish.

HARCO mobilizes a Dynamic Traverse System onto Cadeler's Wind Installation Vessel Wind Keeper

Cadeler

HARCO’s traverse system and operators are ready for Wind Keeper’s first project

Read more
Dynamic Traverse System ready to be mobilized on Cadeler's WIND ORCA

Cadeler

Dynamic Traverse System for Cadeler’s Wind ORCA

Read more
The wind turbines at Arcadis Ost 1 are now fully erected

Heerema

The wind turbines at Arcadis Ost 1 are now fully erected

Read more