HARCO exchanged 4 gearboxes at Ormonde Wind farm during March/April 2021. The exchange was completed successfully in collaboration with site crew.

COVID-19 restrictions during early 2021 complicated the project and added a few extra days, however the gearboxes were exchanged fast, safe and in high quality.

HARCO exchanged two gearboxes fast and safely at Ormonde Wind Farm. The exchange of the two gearboxes was done in 2 days despite COVID-19 restrictions. It is pleasant to work with HARCO – they are fast and flexible, while performing turn-key solutions with a high focus on safety and quality”

Claus Pedersen

Main Component Exchange Supervisor

About the Wind Farm
The Ormonde Wind Farm is situated in the Irish Sea, 10 kilometres off Barrow-In-Furness. The wind farm was fully commissioned in early 2012, and consists of 30 5 MW Senvion turbines. The wind farm covers an area of 8,7 km2, and have a total capacity of 150 MW. (source: powerplants.vattenfall.com)

About HARCO
HARCO goal is to revolutionize the lifting industry with better and smarter applications, prepared for the future. The criteria of success are to provide advisory and knowhow to develop sustainable, cost efficient and cutting-edge solutions for the industry.

HARCO offers wind farm all-in services, main component exchanges, specialist services, equipment specialist services, and development and maintenance of equipment.

As always, HARCO has been utmost helpful during the project – they are extremely flexible, which enables optimization of our operations.”

Rene Henriksen

Main Component Team Lead, Vattenfall